(a) Relocation of the sand and wash plant from current quarry floor to the existing compound level (previous pa reg refs. 20 50298 and 23 51505 schedule b refer)
(b) Down-sizing of the existing permitted electrical control building
(c) Reduction of ground levels at main quarry entrance and access road, including relocation of wheel wash and weigh bridge
(d) Demarcation of car parking spaces at main entrance and accessible parking space provided close to the existing office building
(e) All associated and related site works, operations, ancillary, and associated development associated with the above proposed works.

To find out more details on this Quarry Development in Donegal Applied for on 19th April 2024 take the free trial here.


Address:
Devlinmore

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL