1) Continued use and extension to existing permitted sand and gravel pit registered under Section 261 of the Planning & Development Act 2000, as amended (site ref. QY05/10) within an overall application area of c. 12.2 hectares
2) Extraction of sand and gravel (dry working) over an area of c. 8 hectares with processing and washing of material on site (closed loop water recycling system with associated silt storage lagoons 1,952.25m2), and all ancillary works and structures
3) Site facilities consisting of mobile processing plant, portacabin site office (6.25m²), portacabin welfare facility (18.9m²), serviced portaloo toilet, bunded fuel storage and refuelling pad with hydrocarbon interceptor, weighbridge, wheelwash, water supply borehole, perimeter berms, vegetation planting and fencing
4) Access to the site will be via the existing sand & gravel pit entrance
5) Restoration of the site to agricultural lands and
6) The proposed extraction operational period is for 10 years plus 1 year to complete restoration (total duration sought 11 years). An Environmental Impact Assessment Report (EIAR) and Natura Impact Assessment (NIS) have been submitted with this application.
To find out more details on this Quarry Development in Laois Applied for on 19th September 2024 take the free trial here.