19 April 2024 An Bord Pleanala grants permission with conditions

Development of a solar photovoltaic (pv) energy development. The development site of c. 247 hectares will contain: (i) solar pv panels on ground mounted frames /support structures within existing field boundaries, (iÎ) 30 no. Medium voltage power station (mvps) enclosures (6. 058m long x 2. 348m wide x 2. 896m high), (iii) 6 no. Weather monitoring stations, (iv) 2 no, temporary construction compounds (50m long x 35m wide), (v) internal site access tracks and underground cables (ugc), (vi) ugc in the public road network (l70095, l. 70099, l. 70208-3 & r357), which will electrically connect the development to the derrycarney 110kv substation located within the townland of lumcloon, and (vii) all ancillary development, including; perimeter fencing with access gates at vehicle site entrances along public roads (l. 70095 and the r357), cctv security cameras, landscaping, and all associated civil engineering works, planning permission is being sought for a period of 10 years. A natu

To find out more details on this Power Generation Development in Offaly Granted permission on 19th April 2024 take the free trial here.


Address:
Lumcloon - Bun

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL