A 10 year planning permission for development at lands to the north of the N24 National Road in the townlands of Jamestown, Kilmolash Upper, and Rathkeevin County Tipperary. The development will consist of; Construction and operation of a c. 60MW solar PV farm consisting of solar arrays on ground mounted steel frames, with a maximum overall height of 2.6 metres; Internal underground electrical cabling and ducting; Up to 20 no. transformers; 2 no. temporary construction compounds ; security fencing and cameras; 2 no. new gated site entrances from the R687 local road; New internal access tracks; Site drainage; Landscaping; All ancillary works. Planning permission is sought for a period of 10 years with an operational life of 40 years from the date of commissioning. A Natura Impact Statement accompanies the planning application.
To find out more details on this Power Generation Development in Tipperary Granted permission on 12th April 2024 take the free trial here.