EXPP: PROTECTED STRUCTURE: 1. Remove existing roof. 2. Brace trusses. 3. Replace roof with membrane and glazing as per attached sketch no.1. 4. Replace downpipes and gutters as appropriate on closer inspection.

To find out more details on this Transport Development in Dublin Applied for on 27th June 2024 take the free trial here.


Address:
Powerhouse

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL