Installation of new Combined Heat and Power (CHP) plant powered by mains fed natural gas,adjacent to north east end elevation of existing factory. The CHP plant includes the following components,the CHP Boiler unit, a 10m high stainless steel flue, 10,000 litre water storage buffer tank and concrete base.

To find out more details on this Power Generation Development in Armagh Banbridge & Craigavon Granted permission on 24th September 2024 take the free trial here.


Address:
UPU Industries Ltd

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL