02 Apr 2024
Allardstown WDK – Water Disinfection Kiosk (Tallanstown Rationalization Project) – Construction of modular type kiosk building for containment of mechanical equipment used in the water pumping process. The Kiosk will be for the containment of electrical control panel and pumping equipment associated with the water scheme operations. The Kiosk can be considered as used for a “specialist processes” in relation to TGD Part L.

Permission for the construction of a water pumping station which includes 2.4M high pump kiosk.new road entrance,perimeter fence and gate,drainage and landscaping.

To find out more details on this Water & Sewerage Development in Louth Started on 2nd April 2024 take the free trial here.


Address:
Allardstown

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL