Permission for development which comprises of a new raw water works located on the east bank of the river corrib, 100m downstream of quincentenary bridge; associated pipework to transfer raw water from intake works , which in turn supplies terryland water treatment plant (wtp); and a new treated water rising main extending between terryland wtp and existing rising main on the east bank of the river corrib. The works comprises: new intake works.
a) underground inlet works chamber and associated equipment;
b) control building;
c) compound security fencing and gates, safety fencing, drainage, lighting, hard – standing areas and landscaping, ducting and water supply connection;
d) access road dyke road with new entrance and gates;
e) floating boom system offset 5m inti the river from proposed headwall of the intake works. Slipway.
f) a new slipway, including a new public access road from dyke road. The slipway will be located on the east bank of the river corrib, circa. 140m downstream of
To find out more details on this Water & Sewerage Development in Galway Started on 8th March 2023 take the free trial here.