Erection of replacement wind turbine with a maximum hub height of 40m and a maximum blade length of 26m to replace existing wind turbine approved and built under X/2012/0497/F, associated 2 no electricity cabinets and site works.
To find out more details on this Power Generation Development in Ards & North Down Granted permission on 11th April 2025 take the free trial here.

