For development at this site. The development will consist of : erecting a 2MW Wind Turbine, located to the southwest of our main building; the Wind Turbine will be installed with a hub height of 64 meters and a blade radius of 35.5 meters, with underground ducting connecting to the existing ESB substation and all associated site works at Queally Pig Slaughtering Limited T/A Dawn Pork and Bacon. The application relates to the development which comprises of an activity which holds an Integrated Pollution Control Licence (IPC) (Licence No. P0175-02).
To find out more details on this Power Generation Development in Kilkenny Granted permission on 16th October 2024 take the free trial here.