Proposed replacement of existing wind turbine approved under X/2013/0165/F with a Vestas V52 wind turbine with a tower height of 55m and blade span of 26m, (overall tip height of 81m), regularising of existing laneway and new hard standing area and base for turbine.

To find out more details on this Power Generation Development in Ards & North Down Applied for on 26th July 2024 take the free trial here.


Address:
Approximately 230m NE of 28 Tullyhubbert Road

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL