Erection of new proposed 40m hub height and 54m rotor diameter wind turbine (up to 900kW output) electrical switchroom NIE substation kiosk, cabinet underground cabling hardstanding area hardcored access track and other associated site works.

To find out more details on this Power Generation Development in Armagh Banbridge & Craigavon Applied for on 8th December 2023 take the free trial here.


Address:
100 Metres North-East of No.122 Marlacoo Road

Stage:
Plans Applied


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL