1. Solar PV panels to the existing hotel roof
2. Two new wind turbines, not exceeding 21.2m height
3. A Container battery storage installation with 6 electric vehicle charge points, weather monitoring station and associated site works.

To find out more details on this Power Generation Development in Tipperary take the free trial here.


Address:
Nenagh North and Tyone

Stage:
Plans Withdrawn/Invalid


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL