The development shall consist of planning permission for the erection of two (2) number, three (3) meter high helical vertical axis wind turbines, with each wind turbine upon a twelve (12) meter high demountable support pole, all to support the previously approved planning permission p22/419 and to include all other ancillary site services and development works associated with this permission as contained within the application documentation.
To find out more details on this Power Generation Development in Mayo take the free trial here.

