Extension of Duration of pl. file 19/47 for works, all within the curtilage of protected structure as described below: forming a new recessed vehicular & pedestrian entrance off Passage Rd demolition of 20th Century classroom blocks (Glynn, Jacob, Webster, Foster & Penn) on the Wilkin St side of the school complex &construction of a 4624sqm three storey block with general & specialist classrooms & PV panels to roof demolition of 20th Century entrance block between the Dining hall & Library & the construction of 611sqm two storey entrance block with reception, administration, social or locker areas & staff facilities demolition of the Southern 20th Century section of the Bio-Laboratory & construction of a 500sqm,single storey Special Needs Unit. The Northern section of the Bio-Lab will be retained as an archive museum demolition of entrance lobby to Foy Hall & the construction of a 162sqm vertical circulation core & social or locker area demolition of 4classrooms attached to the swimming pool complex & the construction of a 1149sqm PE Sports or Assembly Hall & a single storey changing & fitness suite with PV Panels to roof alterations to existing buildings & the construction of a 120sqm part single storey, part 2storey horizontal circulation spine from Wyse House to the Bio-Lab, with an extended covered link to the new classroom block alterations to the Dining Room & classroom block to form 2 levels with dining facilities, connected with a new staircase, refurbishment of Wyse House & insertion of new lift & part new staircase to facilitate its use as general classrooms & associated facilities. Wyse house is a protected structure, refurbishment of the Library block including the replacement of the two 20th Century roof lanterns. The Library is a protected structure Relocation of 2 single storey storage containers to the west of the swimming pool & to the east of the new entrance. Total area of new build & refurbishment is 9,289sqm Provision of hard & soft landscaping with new set down area, car parking, new storm water attenuation system & play areas. Any felled trees will be replaced Provision of a temporary construction entrance off Wilkin St Construction of 26no temporary car spaces adjacent to the main entrance for the duration of the construction programme Provision of a temporary 2 storey modular classroom block & a single storey dining & locker area with a combined floor area of 2,396sqm Provision of a combined roadway & fire path adjacent to the Wilkin St& Passage Rd boundary wall together with a 74sqm extended store & covered yard, new drainage & ancillary works.

To find out more details on this School Development in Waterford Granted permission on 8th October 2025 take the free trial here.


Address:
Newtown School

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL