For: a) a single storey 90m2 Activity Room connected to existing Dining Room to provide a new activity room, accessible toilet, storage area and new pantry kitchen, pergola to walkway and a screened high level sprinkler tank room at roof level including all necessary alterations to the existing dining room; b) new two storey lift building and associated lobbies at ground and first floor including all necessary alterations to the existing two storey bedroom wings; c) 12m2 extension to the existing Day Room; d) new 87m2 staff changing facilities and ancillary storage area at first floor level over existing administrative offices including demolition of existing male changing area and adjacent cleaners store including all associated internal and external alterations; e) 4 no. new roof lights to the existing Dining Room; f) 28m2 infill extension to provide new access lobby and extension to existing kitchen and associated alterations to both the existing kitchen and alterations to the existing adjacent accommodation to provide a new sluice room, cleaning store, accessible toilet and shower room, accessible bathroom, wheelchair and hoist storage and access to the Day Room; g) all associated external alterations to the foul and surface water drainage; h) removal of the existing marquee containing dining facilities erected as a temporary health measure to combat the spread of the coronavirus.
To find out more details on this Care Home Development in Dublin Applied for on 12th March 2024 take the free trial here.