The development will consist of the removal of 3 no. prefabricated buildings, demolition of single storey front classroom block, construction of a new two storey extension to the front and side of the existing school buildings and a new parking and set down arrangement at the main entrance and at the opposite side of the public road. The development will include special needs accommodation comprising 2 no. base classrooms, ancillary activity spaces, staff offices and toilets at ground floor level and 3 no. mainstream classrooms with associated toilets, staff offices and ancillary training rooms at first floor level. New staff and visitor car park providing 22 standard car parking spaces and 1 universal car park space, providing a total 23 car parking spaces. A set-down parking bay is to be provided for student drop off. New footways to the school frontage and the far side car park and drop off bay will be provided for pedestrians, including a new uncontrolled crossing point on the local roadway
To find out more details on this School Development in Limerick Granted permission on 25th January 2024 take the free trial here.

