15 Sep 2025 completed Hoxton hotel set to open in Nov 2025

PROTECTED STRUCTURE: The proposed development will consist of: – the refurbishment/reconfiguration, partial sundry demolition and expansion of the Central Hotel (a protected structure RPS. Ref. No. 2719) to result in an overall amalgamated hotel of 6,676.5 sq.m. with a total of 129 no. bedrooms within 5 storeys over basement with a 6 storey element with plant level (above No.12 Dame Court) and will include the following:
1) Demolition of existing 2 storey building No.12 Dame Court (c.304 sq.m) and its replacement with a 6 storey building with an overall height c.21.245m (30.795mOD) including a basement area amalgamated with the hotel with lift and stairs, access for deliveries and refuse storage, and electricity sub-station at ground floor level and hotel bedrooms from mezzanine through fourth floor levels with plant level at fifth floor level; 5 no. windows to new bedrooms to the rear elevation of No.12 Dame Court over mezzanine to fourth floor levels. The external elevational treatment to street is a profiled glazed façade with perforated/profiled metal panels to match the adjacent rooftop extension.
2) Refurbishment and reconfiguration of existing Central Hotel and associated premises as follows:
A) Basement level – Removal of internal partitions/walls to facilitate reconfiguration/refurbishment of basement areas of Central Hotel and Nos 11, 14, 15 & 16 South Great George’s Street to provide ancillary hotel areas including the internal alterations to the existing nightclub and the creation of entrance lobby, toilets, office, cloakroom, storage/plant/attenuation and staff areas. Change of use of basement areas of Nos 14, 15 and 16 South Great George’s Street from ancillary retail storage to form part of an amalgamated hotel use as plant, office/administration space, storage, public and staff toilet areas and part kitchen. Office / Admin space moved to a different location than previously permitted and swapped with staff canteen as well as the main kitchen moved.
B) Ground floor level – Amalgamation of Nos 14, 15 & 16 South Great George’s Street into the Central Hotel and associated change of use from retail to café / delicatessen and bar / restaurant. Reconfiguration/refurbishment of internal areas of Hotel to provide reception, lounge and associated backroom areas. The change of use of the following; ground floor of no. 11 South Great George’s Street from public bar to retail use (as Christian Science Reading Room moved from its current location at No.15 South Great George’s Street); ground floor of No.14 South Great George’s Street from retail use to bar/restaurant use; ground floor of No.15 South Great George’s Street from retail use to bar/restaurant use; ground floor of No.16 South Great George’s Street from retail use to café/delicatessen use; ground floor area at entrance to existing Exchequer Bar to change to become part of hotel reception/lounge; ground floor area as part of the existing Globe Bar/Rí-Rá nightclub from public bar use to retail use as part of the amalgamated hotel; new retail unit on Dame Court (adjacent to No.12 Dame Court); and new entrance door with canopy over to Bar/Restaurant on Dame Court.
C) First floor level – Refurbishment and provision of bedrooms (to include removal and insertion of partitions/WC facilities, insertion of risers); refurbishment of existing ‘Library Bar’ (and associated alterations); change of use of part of Library Bar as 2 no. bedrooms; removal of infill block connected by spiral staircase to existing retail unit at No.15 South Great George’s Street; removal of existing keg room and addition of a garden terrace; removal of ancillary space in courtyard to provide a landscaped platform area (including void to existing basement passageway) with maintenance access only;
D) Second and Third floor levels – Refurbishment and provision of bedrooms (to include removal and insertion of partitions, insertion of risers and removal of exit passageway (external) between existing east and west parts of hotel), introduction of an inaccessible landscaped terrace at second floor level;
E) Fourth floor level – Removal of existing fourth floor level Mansard roof structure of the Central Hotel fronting onto Dame Court and Exchequer Street and its replacement with a new fourth floor level in its place to comprise a screen of narrow vertical metal fins, in front of a wall of glazing and metal panels with a standing seam metal roof in the same colour and material and 2 no. dormers facing onto Exchequer Street; removal of eastern side of pitched slate roof along South Great George’s Street and provision of bedrooms/storage (with flat roof above), the removal of a chimney on Dame Court close to Exchequer Street and the heightening of the remaining chimneys to the ridge height of the new roof to Dame Court; reinstatement of the 2 no. pediments on the South Great George’s Street elevation in terracotta and brickwork; provision of external balcony/terrace areas.
F) Removal of existing lift shafts and stair cores (including chimney) from basement/ground to 4th floor levels and provision of new stairwells/lift shafts/servicing ducts/risers/dumb waiters as well as revisions to circulation/access (including provision of new opes) and removal of internal walls/partitions/replacement of doors as necessary; new glazed opening in existing staircase at first floor level; glazed finish to internal facade of new northern ‘wing’ (which includes bedrooms and access at first to fourth floor levels).

G) External works to include; new canopies/signage, refurbished and replacement shopfronts (and lighting) on Exchequer Street & South Great George’s Street facades (including replacement of existing non-original entrance canopy), replacement of windows at ground floor level; repointing and replacement of existing windows with new timber sliding sash windows; the new façade to the courtyard comprises a glazed screen with vertical metal fins incorporating some metal panels and solar shading devices in the same metal finish; installation of secondary glazing units to bedrooms; entrance treatment and signage throughout above shopfronts to South Great George’s Street and Exchequer Street including the new centralised entrance and the replacement screen doors to Dame Court; and all associated site development works.

To find out more details on this Hotel & Guesthouse Development in Dublin Started on 22nd April 2022 take the free trial here.


Address:
The Central Hotel

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL