A 10 year permission for development at this site on lands at City North Business Campus, Stamullen. Particulars of the development comprise as follows: 1. The provision of 3no. warehouse units with a cumulative gross floor area of 19,612.8sq.m comprising: a. Warehouse unit number 14 floor area comprises 4177.9sq.m of which the warehouse area comprises 3399.7sq.m at ground floor, the provision of a ground floor reception area comprising 130.3sq.m, a first floor office area comprising 316.2sq.m and a second floor plant area comprising 331.7sq.m. The warehouse building will have an overall height of 16.65 metres. b. Warehouse unit number 15 floor area comprises 9624.6sq.m of which the warehouse area comprises 8277.2sq.m at ground floor, the provision of a ground floor office and staff area comprising 450.9sq.m, the provision of a first floor office area comprising 446sq.m and the provision of a second floor plant area comprising 450sq.m. The warehouse building will have an overall height of 16.65 metres. c. Warehouse unit number 16 floor area comprises 5810.3sq.m of which the warehouse area comprises 4996.3sq.m at ground floor, the provision of a ground floor office and staff area comprising 279.1sq.m, the provision of a first floor office area comprising 260.2sq.m and the provision of a second floor plant area comprising 275.8sq.m. The warehouse building will have an overall height of 16.65 metres. 2. Vehicular access will utilise the existing City North Campus roads with an extension of the Campus road. 3. The development of associated internal access roads, turning/loading areas, footways, parking areas, electric vehicle charge points and associated ducting, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works. 4. The provision of façade signage for each warehouse unit. 5. The diversion of existing ditches to include for the extinguishment and infilling of the drainage ditch as installed as part of site works for unit number 8 (as granted under permission 2360046). 6. The provision of an ESB substation. 7. The provision of an external water storage tank and associated water pump house within the curtilage of warehouse unit number 15. 8. The provision of 2no. wastewater pumping stations within the curtilage of warehouse unit numbers 14 and 15. 9. Provision of attenuation tanks and associated infrastructure as part of the surface water systems along with installation of bypass hydrocarbon interceptors. 10. All ancillary site development, landscaping and construction works to facilitate foul, water and service network connections. An Environmental Impact
Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany this application.
To find out more details on this Warehouse Development in Meath Granted permission on 6th June 2025 take the free trial here.

