1) The construction 2 no. connecting single-storey extensions to the existing school, consisting of an entrance space to the front (north) elevation and a construction studies room to the rear (south) elevation
2) The construction of a standalone two-storey school building to the rear (south) of the site, containing 4 no. classrooms, library, GP or dining hall and ancillary educational spaces
3) Demolition of an existing storage room
4) Internal layout changes and alterations to all facades of the existing school block
5) Together with the provision of extending the internal access road, pedestrian footpaths, modification to entrance gateways, additional staff car parking spaces along with designated SEN and bus drop off area. including all associated ancillary site works and connections to services. Permission for retention for
1) External canopy structure to rear of existing school block, currently used as an external area and proposed to be used as an external SEN recreational space in the future.
To find out more details on this School Development in Cork Granted permission on 23rd October 2025 take the free trial here.

