Internal works
a) Conversion of part of the existing warehouse granted under PL21/29 to manufacturing area (808m2). Other works
b) The construction of an extension consisting of manufacturing areas (1060m2) and warehouse areas (1560m2)
c) Construction of a new two-story quality lab (237m2) to the southeast corner of the main entrance block.
d) Relocation of 3 depressed loading dock positions with the provision of 1 new additional dock
e) 20 number storage silos 3m diameter x 11m high
f) Exit ramp for trucks leaving site via local road that connects to the N63 Ballinalee road
g) Demolition of an existing storage shed (79m2)
h) Together with associated signage and all other ancillary and associated site works.

To find out more details on this Warehouse Development in Longford Started on 28th January 2025 take the free trial here.


Address:
Templemichael Glebe

Stage:
Commencement