Permission will consist of a manufacturing/light industry/storage building (gross floor area 12,409 sq.m) delivered in two phases including office and staff facilities; provision of 273 No. car parking spaces (total) including 15 No. disabled spaces and 14 No. electric vehicle (EV) spaces; provision of 82 No. bicycle parking spaces; roof mounted solar panels; alterations to the existing carriageway and footpath to connect to the existing road network; connections to existing foul and storm drainage systems and water main; site lighting; 2 No. standalone MV substations/switch rooms; a gated service yard; 3 No. new dock levellers; internal site footpaths; hard and soft landscaping; fence to perimeter and gated access; boundary treatments; and all associated site development works. As part of the application, a Stage 2 Appropriate Assessment (Natura Impact Statement) has been submitted.
To find out more details on this Factory Development in Louth Granted permission on 31st July 2025 take the free trial here.