Development at this site of c.1.03 hectares, located at Phase 1A, Balmoral Estate, Kells Road, Navan, County Meath. The development will consist of the construction of a Primary Care Centre and associated development (7-storeys) with a total gross floor area of c.7,215 sq.m as follows: I. 1 no. General Practitioner practice unit (239 sq.m) and 1 no. retail pharmacy unit (111 sq.m) located at ground floor level, with a Primary Care Centre (accessed from ground floor level) consisting of 1,477sq.m of treatment/office/support space across ground, first, second and third floor levels, an Enhanced Community Care Hub at third and fourth floor levels (1,182 sq.m), Community Mental Health Team unit at fifth floor level (950 sq.m), Mental Health Service unit at third and sixth floor levels (761 sq.m), Social Care Service unit at ground and third floor levels (587sq.m), Primary Care Centre Dental Practice at first floor level (434 sq.m), Opthalmology facility at first and second floor levels (158 sq.m), Orthodontics unit at first floor level (154sq.m), Audiology department at first floor level (85 sq.m) and a 239 sq.m HSE / Primary Care Team shared service area at ground floor level including clinic rooms and waiting area; ii. Ancillary facilities including entrance/reception areas, canteen, WC, staff changing facilities and external amenity space at sixth floor level; iii. 200 no. car parking spaces at ground floor and podium level (including 20 no. EV charging spaces and 10 no. accessible spaces) and 30 no. bicycle parking spaces accessed from the internal estate road branching north from the N51 Kells Road; iv. 4 no. signage zones (total 33.5sq.m) to facilitate illuminated / backlit signage at eastern elevation: v. Provision of pedestrian and bicycle lane upgrades along the Inner-Relief Road (N51) and entrance to subject site; vi. All boundary treatments, vehicular and pedestrian accesses, landscaping, green roofs, waste-storage facilities, enclosed plant area at roof level, ESB sub-station, water and drainage infrastructure and all associated site development works.

To find out more details on this Medical Centre Development in Meath Granted permission on 23rd January 2025 take the free trial here.


Address:
Balmoral Estate

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL