A 10-year permission for the development which will consist of the phased extension of the existing food manufacturing facility comprising:
1) Construction of an 11,267 m² extension to the existing food manufacturing facility, including:
(a) Cold storage areas
(b) Two-storey office space, toilet block, and drivers’ area
(c) New processing, packing, intake or dispatch areas
(d) Electrical plant, maintenance rooms, and external steel access staircases
(e) New gas tanks, transformer compound, and pipe bridge
2) construction of an 1,500 m³ storage building for packaging and machinery
3) Extension of existing wastewater treatment plant (WWTP) buildings (primary: 107 m², secondary: 250 m²)
4) Construction of an 110 m² waste collection building
5) Extension to the existing water treatment plant (WTP) building (70 m²)
6) Expansion of the high temperature (HT) plant room (64 m²)
7) Construction of 4 no. tanks
8) Installation of 3 no. bunded kerosene tanks (50,000 L each)
9) Construction of a 16 m high boiler stack
10) Construction of new internal access roads (c. 8,825 m²)
11) Creation of a 520 m² internal courtyard area
12) Construction of a 630 m² external storage compound
13) Construction of a 3,120 m³ stormwater attenuation pond and discharge line
14) Installation of a standby treated effluent discharge pipeline (1,490 m)
15) Realignment and expansion of site boundary, including new boundary walls, fencing and planting
16) Provision of an additional 8 no. truck parking spaces
17) Relocation of the existing fuel tank and weighbridge
18) Expansion of the existing sprinkler pump house (24 m²)
19) Conversion of 22 no. existing car spaces including 1 no. accessible space to 22 no. EV car spaces as required and provision of 30 no. bicycle parking spaces
20) Installation of new site lighting
21) Demolition of existing buildings and structures (total 1,840 m²) and
22) All ancillary site development works and services to facilitate the development including drainage, landscaping, temporary construction compound and utility connections. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) has been submitted to the planning authority with this application
To find out more details on this Factory Development in Tipperary Applied for on 18th November 2024 take the free trial here.