24/07/25: Fumbally Lane Hotel. The construction of a new, part 4, part 8-storey, 8067m2, hotel comprising 235 bedrooms at 27-29 New Row South Dublin 8. The ground floor contains hotel reception, communal lounge and ancillary back-of-house spaces, incorporating an ESB Substation.

4/9/24: Demolition works started on site

Proposed Mixed-Use Development: 27-29 New Row South, Dublin 8

Protected Structure: Refurbishment and extension of existing building (RPS Ref.: 5821).
Building Heights: 4-8 stories with setbacks.

Residential:
144 hotel rooms (1st-3rd floors).
69 shared living units (4th-7th floors).

Commercial:
Co-working/artistic-creative studios (213 sqm).
Restaurant (142 sqm).
Community/event space (147 sqm).

Amenities:
Communal residential amenity spaces (screening room, lounges, gym, kitchen, event space).
Courtyard (347 sqm), roof terrace (435 sqm).

Infrastructure:
Plant and storerooms, cycle parking, ESB substation.
Landscaping, boundary treatments, lighting.
Drainage and attenuation systems.

Specifics:

Protected structure modifications: wall removal, window reinstatement, floor and staircase replacement.

New building: 7-story with setback, including reception, amenities, and rooms.
Integration of new and existing buildings via entrance lobby and corridors.

Public open space: courtyard, roof terrace.

To find out more details on this Hotel & Guesthouse Development in Dublin Started on 2nd September 2024 take the free trial here.


Address:
27-29

Stage:
Commencement