09 Feb 2024
Apex Hub Unit 1 ESB Substation, Calmount Road & Ballymount Avenue, Ballymount Industrial Estate, Dublin 12 comprising the construction of a new single-storey ESB substation & switchroom.

01 Jan 2024
Apex Hub External Infrastructural Works, Calmount Road & Ballymount Avenue, Dublin 12 with new footpaths, shared surfaces, linemarking, cycle track; FW, SW drains & watermains; signage, lighting, utilities ducting; hard & soft landscaping.

26 Sep 2023
Apex Hub Internal Infrastructural works, Calmount Road, Dublin 12 comprising new access roads, concrete footpaths, shared surfaces, cycle track; FW, SW drains & watermains; signage, lighting & utilities ducting; & hard & soft landscaping.

Application:
Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m;
– Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehouse / logistics units;
– Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings;
– Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit;
– The proposal includes 5 ESB substation buildings;
– The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths;
– The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and development.

To find out more details on this Warehouse Development in Dublin Started on 1st January 2024 take the free trial here.


Address:
Calmount Road & Ballymount Avenue

Stage:
Commencement