Ext of Duration: The development will principally consist of the demolition of all shed structures on site (647 sq m) and the construction of a part 1 No. to part 8 No. storey over basement and part lower ground floor hotel, providing 261 No. bedrooms (8,369 sq m). The development will also include: The provision of pedestrian access to the Hotel from Molyneux Yard a landscaped garden (125.5 sq m) at basement level a bar (156.6 sq m) at lower ground floor level a cafe (100.4 sq m) at ground floor level with access onto Engine Alley a dining room (140.6 sq m) with an external ground level terrace (36.7 sq m) fronting onto Molyneux Yard a roof terrace at sixth floor level facing north and north-east bicycle parking hard and soft landscaping plant ESB substation and all other associated site works above and below ground.
To find out more details on this Hotel & Guesthouse Development in Dublin Granted permission on 31st October 2025 take the free trial here.