08 Feb 2024
Construction of a new 14 sq m Single Storey MV Switchroom building.

Modifications to the existing building’s façade and roof to include: 3 No. flue and 3 No. roof exhaust ducts of 0.86m max height above the parapet level, 1 No. personnel door and 5 No. ductwork penetrations to the North Façade, 1 No. personnel door, 1 No. 3.7m X 3m plant access roll-up door, 3 No. 500mm dia exhaust fans and 4 No. pipework penetrations on the East Façade; Proposed cable tray penetration into East façade of an existing ESB substation; Construction of a new 110sqm external MV Switchroom Compound consisting of a 13sqm single storey Client MV Substation building of 3m total height and a transformer within 2.5m security fencing enclosure; Construction of a 355sqm external plant compound ith 2 No. air handling units, 2 No. scrubbers, associated fans and exhaust stacks of 13.1m max height, all within 3.5m high acoustic enclosure; Construction of a 860sqm external plant yard to consist of Waste Water Treatment Plant with 9 No tanks of varying sizes of maximum 2.5dia x 5m high, 6 No. chemical tanks and associated pumps, 2 No. heat pumps within 3.5m high acoustic enclosure, 8.5m high liquid nitrogen tank and vaporiser within 2.5m high security fencing enclosure, a generator, and 5.5m high elevated steel pipe bridge with associated pipework and cable tray penetrations into the North façade; Construction of a 22sqm external waste store with associated 2m high screens; together with associated amendments to both soft and hard landscaping & paving and all other ancillary site works.

To find out more details on this Light Industrial Development in Louth Started on 8th February 2024 take the free trial here.


Address:
Dundalk Science & Technology Park

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL