An amended layout of 5 wind turbines of up to 2.5 megawatt power output (or 12.5 MW total) each with a maximum overall base blade to tip height of 120 metres; Ancillary developments will comprise turbine transformers; turbine hardstands widening and strengthening of an existing site entrance; amendments to the design of the electrical control building; communications antennae on control building widening of existing track construction of new access tracks and junctions; undergrounded electrical cables and communications lines connecting wind turbines to control building; on site drainage works; a temporary site compound; installation of a permanent met mast and all ancillary and associated works.
To find out more details on this Power Generation Development in Fermanagh & Omagh Granted permission on 2014-12-15 take the free trial here.