Permission for the construction and operation of a concrete batching plant which will produce up to 70,000m3 of ready-mix concrete annually. This will replace the existing concrete batching plant that was permitted under application reference S/98/4005, which will be dismantled and removed as part of the proposed development. the application area will cover 1.02 hectares and is located within the northern portion of Carrigtwohill Quarry. Carrigtwohill Quarry is an existing active quarry, located within the applicants landholding, and covers an area of 91.92 hectares. the proposed concrete batching plant will include concrete plants (x2), 120 tonne cement silos (x8), 50,000L water tanks (x2), storage bins (x10), control cabin/welfare facilities (port-a-loo type unit), conveyor system (x2), washout lagoons, an access ramp and associated drainage infrastructure including a settlement tank and an attenuation tank. Roadstone intends to utilise both virgin aggregates (from Carrigtwohill Quarry) and recycled aggregates from the existing waste facility. Permit on-site (reference WFP-CK-15-0154-02) in accordance with the National End of Waste Criteria for the Recycled aggregates. a Natura Impact Statement will be submitted to the Planning Authority with the application.

To find out more details on this Light Industrial Development in Cork Granted permission on 18th March 2025 take the free trial here.


Address:
Carrigtwohill Quarry

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL