PROTECTED STRUCTURE: The development will consist of general upgrade and repair work to the building as follows:
1. Internal fire upgrade works to include fire stopping, upgrading doors and provision of additional internal doors,
2. Enlarge existing window on north elevation facing into rear courtyard to form new fire escape door,
3. Repair of external fabric to include roofs, repointing work, repair & some replacement of windows and roof lights,
4. Revised layouts and alterations to some internal spaces at ground and first floor levels, to include mechanical ventilation,
5. Additional toilets at ground and second floor levels,
6. Two new nameplates and letter boxes to front entrance gates,
7. Services upgrade work to include installation of new mechanical plant area of 70m2 to rear courtyard, solar PV panels to flat roofs, total area 113m2, mechanical ventilation and associated ductwork, rewiring, replacement of redundant fittings, emergency lighting and fire alarm and associated builder’s work,
8. Remove existing stone infill and create new timber entrance door at Foster Place portico,
9. New finishing kitchen at ground floor level,
10. Upgrade existing lift off East Hall to provide access from ground floor to basement,
11. Other minor reordering works,
12. Redecoration.
The building is a Protected Structure.
To find out more details on this Office Development in Dublin Started on 24th February 2025 take the free trial here.