Permission for development which will consist of the construction of a 1 and 2 storey building to replace the existing prefabricated classrooms on site with a total floor area of 2,649.6m2 comprising of 6 general classrooms, 1 technology room with preparation area and project store, 2 science laboratories with a shared preparation area, 1 home economics room, 1 computer lab, 1 oratory, 1 music room and a 2 classroom SEN unit with direct access to its own outdoor play area and sensory garden with all necessary associated ancillary spaces, including principals office, WCs kitchen, plant rooms and storage spaces, the installation of roof mounted solar PV panels, ASHP and enclosure, enclosure for 2 LPG tanks, 2 no. static water storage tanks (below ground), the demolition of prayer room (40m2) and reconfiguration of WCs, demolition and reinstatement of part of the existing music room to facilitate the works with the addition of a new window, the removal of a single storey prefabricated 5 classroom block (222m2) together with site works comprising: provision of one-way set down system and the addition of car parking spaces to the front of the main school, grasscrete access road to provide fire tender access around the building and all associated drainage and site development works and improvements.

To find out more details on this School Development in Wexford Granted permission on 28th May 2025 take the free trial here.


Address:
Templeshannon

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL