PROTECTED STRUCTURE: (A) Repair, refurbishment, alteration and extending of 39 Kevin St Upper, a two storey schoolhouse building (protected structure DCC RPS ref. no. 4187) for conversion to use as a two classroom special education needs unit with works including: demolition of the rear staircase, an outhouse, roof with lantern rooflight to an octagonal rear return and some internal walls; filling in of the entire rear yard with a new two storey extension containing learning spaces, stairs, lift and toilets with extension overhanging to the east and west; renovation of the existing building including thermal upgrades with works to roof, windows, chimneys, walls and floors with all associated building services works; external works including construction of an external ramp and bench.
(B) Extension, new floor and alterations to the main school close building on St Patrick’s Close, a two storey school building with single storey side annex with works to including : demolition works on the roof of the building to include removal of a water tank and sections of the parapet wall and construction of a new third floor to the building containing four classrooms with roof lights, PV panels and tank room to the roof over; demolition of the existing administration and entrance annex to western side of the close building and construction of a new three storey circulation extension in its place containing lift, stairwell, toilets, office and other ancillary spaces; all associated internal alterations to the close building including extension of the existing stairwell to the new third floor, internal ramp and internal alterations; external works including alterations to the front (north) boundary and railing to include for new ramped stepped entrance approach and alterations to the rear (south) yard to include for ramped stepped rear entrance.
(C) Works to the school Pakenham hall a single storey historic structure which directly neighbours the close building to the west to include : demolition of the eastern abutment of a non-original extension to the rear of the hall; blocking up of side opes and stripping back of some non-original structure.
(D) All other associated site works including laying of services throughout site and installation of an attenuation chamber under the school yard.
To find out more details on this School Development in Dublin Applied for on 22nd December 2023 take the free trial here.