15 Feb 2025
An appeal lodged in August 2024 with An Bord Pleanála against Meath County Council’s decision to grant planning permission for the proposed development has been subsequently withdrawn.
The proposed development will consist of 3 no office blocks and all associated site development works (GFA. 20,633 26m2) as follows; 1. Block A: 5 storey office building providing offices, stair and lift cores and plant rooms (GFA 10,260.42 m2)2. Block B: 3 storey office building providing offices, stair and lift cores and plant rooms (GFA 5,186.54 m2). 3. Block C: 3 storey office building providing offices, stair and lift cores and plant rooms (GFA 5,186.30 m2). 4. The development includes a surface car park which includes 323 no. car parking spaces and 320 no. bicycle car parking spaces (including 16 no. accessible car parking spaces and 12 no. EV charging spaces). 5. Undertaking of road upgrade works including the provision of a signalised junction on the R157 Dunboyne Road and the construction of a section of the Maynooth Outer Orbital Route and provision of associated pedestrian and cycle infrastructure, as well as a realignment of a section of the R157. The works to the R157 adjoin the Carton Demesne Wall which is a Protected Structure (RPS Ref 91556). 6. Vehicular access to the site will be provided via the R157 Dunboyne Road and provision is made for a secondary vehicular access via the proposed section of the Maynooth Outer Orbital Route. 7. Provision of water, foul and surface water drainage infrastructure including pumping station. 8. Provision of a new pedestrian & cycle bridge structure at the River Rye Water adjacent to the existing Kildare Bridge. 9. Provision of roof mounted solar PV panels on Office Blocks A, B & C.10. Provision of 3 no. ESB Kiosks. 11. Provision of bin stores. bike stands, landscaping, boundary treatments and public lighting and all other site development works and services ancillary to the proposed development. 12. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the planning application.
To find out more details on this Office Development in Meath Granted permission on 24th July 2023 take the free trial here.

