A 10-year planning permission for a proposed development that consists of the part demolition, extension, reconfiguration, and refurbishment of an existing production and manufacturing facility. The proposed development includes for: Partial demolition of the existing facility, warehouses and storage shed, and excavation and site clearance at the rear of the site to facilitate the proposed works. Removal of existing ESB substation. The construction of production area; cleanrooms; a whiteroom; QC lab; plant areas, warehouse, workshops, ancillary offices, reception, canteen, and staff facilities and amenities within the existing areas to be refurbished and extension to the facility. There will be an overall gross floor area increase of c. 3,578 sq.m. Provision of sprinkler tank and pump house; storage silos; an ESB substation (including ESB equipment, MV switchgear and transformer) and the relocation of a generator. The reconfiguration of existing car parking and proposed additional parking resulting in 113 no. car spaces overall (including 5 no. disability spaces and 5 no. EV spaces). Provision of 2 no. bikes stores for 40 no. bicycle storage spaces. Truck loading bays and turning yard. Landscaping (including resurfacing of the existing access to the Tinahely Recycling Centre); boundary treatments and SUDs measures. External site lighting. Provision of solar PV panels at roof level and signage to the building facades. All associated and ancillary works and services necessary to facilitate the construction and operation of the proposed development. This planning application will be accompanied by a Natura Impact Statement (NIS).
To find out more details on this Factory Development in Wicklow Applied for on 19th February 2024 take the free trial here.