1) The construction of a new standalone 3,879.1 sq.m extension. The building height varies from 1 to 2 storey. Accommodation provides for, 13 General Classrooms, 11 SET rooms, 2 Science Laboratories with associated preparation room, 1 home economics room, 1 Textile room, 1 Engineering room with associated prep room, 1 Art room with associated project store, 1 graphics room with associated project store, 1 Staff room, 1 kitchenette, 1 Library, 1 General purpose hall, ancillary accommodation and circulation

2) Construction of a new access road, 2 No. delivery set down areas, 1 No. Maintenance set down area and a shared pedestrian and vehicular surface area, linking into the existing one-way system

3) Relocation of 1 No. pedestrian crossing

4) Construction of 64 No. cycle spaces and 17 No. car parking spaces

5) New signage comprising of a wall mounted metal signage near the main building entrance

6) Construction of foul pump station and soakaway

7) Construction of ESB substation and switch room

8) Relocation of 2 No. existing 2×1 tonne gas tanks to the north, removal of 1 No. 600kg gas tank and replace with 1 No. 1 tonne gas tank

9) Construction of LPG, Bin store and heat pump compounds

10) The removal of 3 No. existing prefabricated classrooms

11) All associated ancillary site development and landscaping works.

To find out more details on this School Development in Kilkenny Granted permission on 4th November 2025 take the free trial here.


Address:
Colaiste Mhuire

Stage:
Plans Granted