For the construction of 2no. cold store buildings (1468m2 x 2), 1no. out loading building (695m2) with a link corridor (63m2) to the existing building, and associated site works including a proposed yard, access road, boundary treatments, concrete paving, drainage works, landscaping and the demolition of 1no. existing building. The cold stores and out loading building are to be used for the storage and dispatch of food related products at their site.
To find out more details on this Factory Development in Kilkenny Started on 22nd January 2025 take the free trial here.

