02 Sep 2024
Unit 1, Unit 2, Unit 5 including sub-stations, standalone switch room, pump house and gate house at site within the townlands.
The proposed development will consist of: The construction of five logistics / warehousing units (Units 1 – 5) with associated office accommodation, service yards, ancillary structures/areas, and substations. The overall floor area of the proposed logistics / warehousing units is c. 56,932 sq.m (Gross Internal Area (GIA)) with a total of c. 4,336 sq.m of office space. See following breakdown of each unit: Unit 1 will comprise GIA c. 10,432 sq.m (including c. 579 sq.m of associated office space) and measures c. 17.9m from finished floor level (FFL) to roof ridge; Unit 2 will comprise GIA c. 18,065 sq.m (including c. 1,005 sq.m of associated office space) and measures c. 18.4m from FFL to roof ridge; Unit 3 will comprise GIA c. 6,325 sq.m (including c. 579 sq.m of associated office space) and measure c. 17.4m from FFL to roof ridge; Unit 4 will comprise GIA c. 8,762 sq.m (including c. 484 sq.m of associated office space) and measures c. 17.6m from FFL to roof ridge; Unit 5 will comprise GIA c. 13,348 sq.m (including c. 1,689 sqm of associated office space) and measures c. 17.8m from FFL to roof ridge; Access to the site will be from the existing roundabout to the south of the site; Provision of no. 419 car parking spaces and 172 bicycle spaces to serve the proposed development; Associated works for the diversion of the existing foul sewer within the site; The provision of attenuation basins / wetlands across the site; Associated works for re-routing of the existing ESB overhead wires which traverse the site to underground cables within the site; The formation of plateaus on the site with surplus excavated material to allow for the future Phase 2 development and; All ancillary landscaping, boundary treatments, internal roads and roundabout, cycle / pedestrian paths, associated infrastructure, and site development works to support the development.
To find out more details on this Warehouse Development in Dublin Started on 2nd September 2024 take the free trial here.