PERMISSION & RETENTION: The development will consist of: 1. Planning Permission: a) The demolition of (i) recent (unauthorised) west walls to the carpark; (ii) timber-framed, glazed, garden room at lower ground floor (220sqm), roof profile to be modified as required at (b) below; and (iii) a previously existing roofed outdoor seating area at upper ground floor level (51sqm); b) The construction of a five-storey extension (1395sqm) to the south part of the existing two-storey building, containing public house/restaurant on lower and upper ground floors and boutique hotel bedrooms on first, second and third floors. Bedrooms to be provided with balconies/terraces facing east and west; public house/restaurant to have terraces facing east at both levels. Ancillary services to include waste storage at lower ground level with service lift to upper ground floor level (street level); c) Enclosed plant room to rear (east) on roof of existing public house (first floor level); d) Associated hard and soft landscaping, including drainage and works to public sewer and 8 No. of cycle parking spaces.
2. Retention Permission: e) Alterations to the west (front) facade to provide two no. shopfronts with names over, and two storey extension (21sqm per total) to the rear, facing east; f) New window to east elevation, lower ground floor; g) Steel pedestrian gate at north-east corner of site.
To find out more details on this Bar & Restaurant Development in Dublin Granted permission on 23rd February 2024 take the free trial here.