14 Apr 2025
Charlemont Aparthotel , Construction of a new 6 storey over lower ground floor 47 unit aparthotel at Charlemont Place, Dublin 2.

20 Jan 2022
Amendments to the permitted aparthotel development as granted under Dublin City Council Reg. Ref. 3549/19 [An Bord Pleanála Case Reference PL29S.305585] and amended under Dublin City Council Reg. Ref. 3196/20, to include the following modifications:

an additional 3 No. aparthotel bedrooms which will increase the number of bedrooms from 44 No. to 47 No.; omission of Basement Level -2 which provided a plant enclosure;

internal modifications at all levels; provision of a lightwell to east elevation of the 2 No. additional bedrooms at Basement Level -1; relocation of bicycle parking at Basement Level -1;

omission of 3 No. car parking spaces at Basement Level -1;

provision of an external bin store at Basement Level -1;

modifications to plant enclosure at Roof Level; provision of a ballasted guardrail (1.1 m high) at Roof Level; provision of a lift overrun which extends to 19.375 m; modifications to permitted signage on west elevation;

modifications to permitted entrance canopy and associated signage facing south;

elevational changes; modified landscaping; and all associated site and development works above and below ground.

The total gross floor area of the permitted aparthotel development will be reduced from 1,737 sqm over basement level of 666 sq m to 1,711 sq m over basement level of 401 sq m.

Permission for development at a 0.1024 Ha site at Charlemont Place, Dublin 2, principally bounded by a commercial building (No. 21 Charlemont Place) to the south, the Green Line Luas track to the west, the ‘Peter Place’ residential dwellings to the north and the ‘Hilton Mews’, ‘Harcourt Terrace/Harcourt Mews’ residential dwellings and a commercial building (Charlemont House) to the east. The site incorporates a Protected Structure (a Spring Well). The development will consist of: a 36 No. bedroom part one to part six storey (over a part double basement) aparthotel (1,763 sq m over 660 sq m at basement level); 9 No. ancillary basement car parking spaces; vehicular access to the basement car park via the existing ramp to the west; pedestrian access via the existing laneway at the south-east of the site; a screened roof terrace (facing all directions) at fourth floor level; bicycle parking; hard and soft landscaping including a green wall; loading bay; boundary treatments; plant and all associated development works above and below ground.

To find out more details on this Hotel & Guesthouse Development in Dublin Started on 14th April 2025 take the free trial here.


Address:
Charlemont Place

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL