Demolition of an extension to the main school building (148 sq.m); removal of temporary prefabricated classrooms (510 sq.m), temporary dining hall (126 sq.m) and sheds (44 sq.m); refurbishment of the main school building (1769 sq.m); construction of 2 no. 2-3 storey extensions (4843 sq.m) to contain general and specialist classrooms, a special education needs (SEN) unit, PE hall, general purpose hall, offices, staff room, library, social spaces, sanitary facilities and ancillary spaces, including solar photovoltaic panels at roof level; removal of the existing play area and construction of 2 no. multi-use games areas; provision of a landscaped courtyard area, amphitheatre and SEN play area; reconfiguration of the existing staff and visitor car parking (58 no. spaces) area to provide a total of 61 no. staff parking spaces including 12 no. electric vehicle charging spaces and 5 no. accessible parking spaces; provision of 28 no. sheltered and 8 no. non-sheltered bicycle parking spaces; improvements to the existing bus drop off area and provision of a new car drop-off area with 2 no. new vehicular entry/exit points along the Mullingar Road; provision of general landscaping, upgraded boundary treatments, retaining walls, associated drainage, attenuation and other site services including an ESB substation and electrical switch room (24 sq.m) and external bin areas; and all related site development works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application.
To find out more details on this School Development in Westmeath Granted permission on 29th January 2024 take the free trial here.