• The construction of 2 no. warehousing/industrial/logistics buildings (approx. 8,564 sqm total GFA) in the form of Unit 28A (approx. 3,198 sqm and 14.9m in height) and Unit 28B (approx. 5,366 sqm and 16.5m in height) including ancillary office space, reception area, lobby, circulation areas, plant, tea stations, stores, WCs and shower facilities for each building;
• The provision of 4 no. dock levellers and 2 no. doors on grade for Unit 28A and 6 no. dock levellers and 2 no. doors on grade for Unit 28B for loading and unloading of Heavy Goods Vehicles;
• The provision of 27 no. car parking spaces (including 2 no. EV parking spaces) and 24 no. secure bicycle parking spaces for Unit 28A and the provision of 54 no. car parking spaces (including 4 no. EV spaces) and 36 no. secure bicycle parking spaces for Unit 28B;
• 3 no. new vehicular access / egress points are proposed in the form of 1 no. shared services / HGV access points to serve Unit 28A and Unit 28B separately via Rowan Tree Road;
• 2 no. vehicular access points to the serve staff car parking areas for Unit 28A and Unit 28B separately via Alder Road;
• Provision of 1 no. bin store (approx. 10.8 sqm) and 1 no. recycling store (approx. 19 sqm) for Unit 28A and the provision of 1 no. bin store (approx. 21.2 sqm) and 1 no. recycling store (approx. 32 sqm) for Unit 28B (approx. 83 sqm total GFA);
• Each building has 2 no. signs (both 10m x 2m) (approx. 80 sqm total GFA);
• Each building has PV solar panels at roof level;
• All associated site development works including lighting, external plant, landscaping and engineering works. There is a separate live planning application (Reg Ref: 23/516) associated with a small portion of this site for public realm works.
To find out more details on this Warehouse Development in Kildare Granted permission on 19th February 2024 take the free trial here.