18 Mar 2024
Construction of a New Electrical Sub-Station building to house Electrical Panels to facilitate operation of Warehouse Storage Facility

08 Apr 2024
Construction of Whiskey Maturation Warehouse (D189/D190) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

08 Jan 2024
Construction of Whiskey Maturation Warehouse (D187/D188) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

16 Oct 2023
Construction of Whiskey Maturation Warehouse (D181/D182) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

04 Jul 2023
Construction of Whiskey Maturation Warehouse (D179/D180) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses. https://nbco.localgov.ie/node/258602

03 May 2023
Construction of Whiskey Maturation Warehouse (D177/D178) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

20 Feb 2023
Construction of Whiskey Maturation Warehouse (D185/D186) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

06 Dec 2022
Construction of Whiskey Maturation Warehouse (D183/D184) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

13/07/2022
Construction of Whiskey Maturation Warehouse (D171/D172) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

20 Jun 2022 Construction of Whiskey Maturation Warehouse (D173/D174) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

17 Mar 2022 Construction of Whiskey Maturation Warehouse (D175/D176) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

04 Jan 2022 Construction of Whiskey Maturation Warehouse (D169/D170) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

22 Nov 2021 Construction of a New Electrical Sub-Station building to house Electrical Panels to facilitate operation of Warehouse Storage Facility

29 Oct 2021 Construction of Whiskey Maturation Warehouse (D167/D168) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

14 Aug 2021 Construction of Whiskey Maturation Warehouse (D165/D166) in a development consisting of similar buildings (each containing two warehouses). Buildings have plan dimensions of 48.4m x 65m with a height to eaves of 9.575m and a ridge height of 11.69m. The structure is a double span steel portal frame on a 6.5m grid supported on pad foundations. The roof is of Kingspan KS1000RW cladding supported on steel purlins and walls are constructed in blockwork. A central separating wall divides the building into two warehouses.

The expansion of the existing maturation warehouse facility and all ancillary site development works. The proposed development includes 60 no. Maturation warehouses, which will be constructed in 30 no. Blocks of 2 warehouses and 3 no. Esb substations. Ancillary site development works include landscaping, tree felling, berming, fencing settlement basin and a surface water attenuation pond. Access to the expanded maturation facility will be via the existing entrance and access road from the l3800. Emergency access will be provided via the existing gated entrance from the l7693. An environmental impact assessment report (eiar) has been prepared and will be submitted to the planning authority with the application. The proposed development is for modifications to an establishment to which the major accident directive applies.

To find out more details on this Warehouse Development in Cork Started on 20th June 2022 take the free trial here.


Address:
Ballynona North

Stage:
Commencement