The development will consist of: (i) An extension to the permitted Clonymeath Solar Farm (Pl. Ref: 21/546, ABP Ref. 311760) comprising the construction and operation of a solar photovoltaic (PV) farm consisting of solar arrays on ground mounted steel frames with a maximum overall height of 3 metres above ground; (ii) 3 no. medium voltage power stations, underground electrical cabling and ducting, security fencing and CCTV stands; (iii) Provision of new internal access tracks linking with the access track permitted under Pl. Ref: 21/546, ABP Ref. 311760; (iv) Site drainage; (v) All ancillary site development works and apparatus. Planning permission is sought for a period of 10 years with an operational life of 35 years from the date of commissioning
To find out more details on this Power Generation Development in Meath Granted permission on 18th June 2024 take the free trial here.