Permission to erect 1.7 MWp or 13382.61 sqm Solar Photovoltaic (PV) in a Carport System in Cork Airport and associated site works comprising of the development will consist of photovoltaic panels with a capacity of 1.70 MWp incorporating a carport system along with all ancillary cabling and electrical infrastructure. this includes a new trench for ductwork terminating at the switch room situated at the front of the terminal building as well as one LV/MV transformer. additionally the development will include temporary welfare facilities and a compound for storing materials required for the installation as detailed in the plans.
To find out more details on this Power Generation Development in Cork Granted permission on 19th May 2025 take the free trial here.

