Permission for the change of use of the existing Hampstead building of 5,405 sqm from office use to use as a healthcare facility. Works include the internal reconfiguration of all 5 no. Floors to accommodate the proposed healthcare facility use. At ground floor level it is also proposed to extend the lobby by 14 sqm by removing the existing draught lobby and providing a glazed double height entrance lobby. At basement level, it is proposed to reconfigure the existing car park by providing 3 no. Additional spaces at the entrance, removing part of an existing wall to allow two-way traffic and filling in an existing opening at the south-east corner of the basement to accommodate 2 no. Car parking spaces. In the basement, it is proposed to provide a generator area of 27 sqm, an area for the clinical waste of 16 sqm, an additional lift core that extends up through all floors and 16 no. Long-stay bicycle spaces. At roof level, it is proposed to extend the existing plant enclosures by a total of 49 sqm, provide 2 no. skylights of 9 sqm each and accommodate the over-run from the proposed life core. External modifications comprise the provision of 2 no. additional fire exits at the western façade and an additional entrance on the eastern façade. It is proposed to provide an ambulance parking area at the entrance to the building and to amend the existing surface level car parking to maintain 2 no. car parking spaces and provide 1 no. Universal Access Parking Space, a loading area and 32 no. bicycle stands.
To find out more details on this Medical Centre Development in Dublin Granted permission on 2019-02-26 take the free trial here.