Protected structure: a 5 year planning permission for works to baptistery floor conservation to include: 1) photographic record 2) lift raised sections of tiles and investigate sub-floor swelling 3) sub-floor repairs 4) gate and railing repairs 5) clean floor tiles 6) replace loose/ lifted floor tiles and mortar repairs to joints 7) localised repair to detached/ broken floor tiles, fill and re-point disturbed areas and consolidation of friable surfaces. The cathedral is a protected structure under local government, planning and development act 1999.

To find out more details on this Church & Community Development in Dublin Granted permission on 2016-12-07 take the free trial here.


Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL