Retention of development consists of a 510 sq. M single storey temporary offices and 130 car park spaces. Planning permission for development will consist of the following (i) a new detached 2 storey 252sq. M utility building to include esb & electrical switch rooms at level 1 and control room, wc & mcc room on level 2 (ii) a detached single storey 63sq. M sprinkler pump house and associated sprinkler water storage tank (iii) 8 no. Bunded external product storage tanks with a 250sq. M covered tanker unload facility and associated pipe rack (iv) the conversion of an existing covered external chemical storage area to an internal entrance area of 130sq. M to contain a new entry ramp (v) provision of 195 new additional car parking spaces (vi) re-positioning of 2 no. Existing boundary gates and 1 new staff entrance gate which will include a covered walkway within the site boundary and all associated site development works for the above.

To find out more details on this Factory Development in Cork Granted permission on 23rd January 2020 take the free trial here.


Address:
Ballytrasna

Stage:
Plans Granted


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL