Construction of a new 3 storey (6795sqm) extension to the existing production facility on the east side of the building. This application proposes the parapet height of the extension of approx 19. 5m above grade to match the existing parapet. The proposed extension will accommodate production, storage, warehouse with associated utilities, similar to those of the existing established concentrate and beverage base manufacturing facility on site. It is proposed to provide 2 new truck loading docks on the east side of the extension and also to modify the existing truck dock bay to accommodate a new access and escape corridor. The proposal will include roof mounted air handling units, condensers and a lift motor room at roof level. The roof of the proposed air handling units and lift motor room will be approx 22m above grade. It is also proposed to construct a separate storage building (288sqm) adjacent to this proposed extension. This storage building will house bulk storage tanks.

To find out more details on this Factory Development in Mayo Started on 2018-11-14 take the free trial here.


Address:
Garrankeel

Stage:
Commencement


Hundreds of similar projects available online.
Take a FREE trial.

FREE TRIAL