For the installation of a new boiler within an existing boiler house building and will include for: 1) The erection of a new dedicated 25m high stack to serve the new boiler adjacent to an existing stack, 2) Minor alterations to the existing facade of the existing boiler house building which include the provision of a new access door and louvres, 3) New roof mounted ductwork to the boiler house and all associated works.

To find out more details on this Light Industrial Development in Tipperary Granted permission on 2015-11-02 take the free trial here.


Address:
Ballydine

Stage:
Plans Granted